Urban political and engineering projects, Guangzhou University, in 2004, started construction in 2004, opened to traffic. The whole section of 6.4 km, two-way six lane and bike lanes, sidewalks, one of the three roads 80 kilometers, the design speed of 40&mdash.
© 2016 Guangzhou Zhongyuan Construction Engineering Co. Ltd. All rights reserved.
Recruit Contact Weibo