Projects

Guangzhou-Shenzhen Expressway

Guangzhou Shenzhen highway, Changan, started construction in 1995, opened to traffic. The two-way six lane, the design speed of 120 km, 2.2 km section.

© 2016 Guangzhou Zhongyuan Construction Engineering Co. Ltd.     All rights reserved.

Recruit     Contact     Weibo