Zheng Xi Railway Passenger Dedicated Line Yanshi Luoyang bridge, started construction in 2008, completed the erection of the beam in 2006. Our company to undertake the construction of the main bridge, 14.5 km long, of which the construction of the Yanshi factory of 516 specimens of beam beam, single frame beam prefabricated 900 tons.
© 2016 Guangzhou Zhongyuan Construction Engineering Co. Ltd. All rights reserved.
Recruit Contact Weibo