On September 10, 2015, Guangdong Provincial Committee Deputy Secretary, Secretary of the Shenzhen Municipal Party Committee Ma Xingrui to Shen Yun of China electric power construction contractors depot for research, and learned about the dark cloud Depot building, listened carefully to the Metro 7, building 9, Line 11, line 6, line 8, Line 10, reports of previous work
Shenzhen Metro cultural and sports park and ancillary works for Shenzhen Metro Line 7 line on a dark cloud Depot property projects, the vehicle section of the ancillary works. Project is located in zone, Nanshan District, Shenzhen tanglangshan, longzhu road, North of tanglangshan mountain, South East side of the ping rapid, Xiang Rui Yuan residential area to the South.
On July 22, the Tangshan branch Assistant Manager Li Dongkai, Chief Engineer Liu Hui, General Manager Ma Chunfeng, the Security Manager and safety Director Zhao Haijun Bai Riguang visit Zhengzhou to inspect and guide the work of the project, and to call out the rectification meeting of the project team.
As the last car finished pouring concrete, on May 31, the Chengdu Jin-a project manager John Fahey art fifth, first to complete the seven-storey building construction work, contributed greatly to the construction of the remaining building work.
On June 9, in the second of three the company Chengdu branch of our art of Jin-a project set up to share school ushered in the first class. We as teachers and students teach each other and share knowledge in different areas.
The afternoon of June 5, the construction unit, prospecting units, design units, supervision, and Government quality supervision Department of Chengdu Manager Kai Yang 3# Plaza project based inspection of the floor.
The afternoon of May 26, "three hearts" moral education into the company Forum, more than 60 young employees gathered together in one, share in a "three hearts" education of the feast.
© 2016 Guangzhou Zhongyuan Construction Engineering Co. Ltd. All rights reserved.
Recruit Contact Weibo