Industry News

Safety management system of bulk cement vertical flow tank

Safety management system of bulk cement vertical flow tank

1 flow, bulk cement tank refers to the line with People's Republic of China WB/T1010-2000 industry standards, quality and technology supervision departments products issued by a valid certificate of inspection of bulk cement vertical flow tank. In the course of construction within the administrative area of the city, mobile tank installation, use, management and other activities, to comply with these provisions.

2, for the construction site of the flow of bulk cement tank capacity must be greater than 30T, height of 8M, vertical bulk cement tank exceeds this range for fixed tanks.

3, flow of bulk cement tank installation location and Office area, living area, separate jobs, and maintain adequate safety distances (minimum safe distance of flow twice times the total height).

4, mobile tanks should be designed with members from mobile for bulk cement tank production (manufacturing) unit or construction unit, mobile tank installation and use by units, mobile tank Foundation design examined by supervision unit and monitor its use. Foundation design of supervision have been approved as mobile tank installation based on one of the.

5, mobile for bulk cement tank installation and use, should have special security measures and dust control and other measures to reduce environmental impact, safety measures and measures should be reported to the supervisor reviews and signed by Chief supervision engineer recognition.

6, flow of bulk cement tank units must appoint a specialist is responsible for over flow tank in operation and management, to set up safety warnings and operating tips mark. Small cement mixer

7, flow of bulk cement tank for bulk cement from entering construction sites prior to installation, supervising engineer must be reviewed by the base design, bulk cement, and security office or its delegate national-record registration. Before using, you must notify the Municipal Office for bulk cement or his delegate unit identification. As part of construction safety supervision and registration above.

8, after completion of the construction tasks, mobile tank tank units should be removed in time flow, safety officer to supervise the process of demolition, workers finished clearing.

9, flow of bulk cement tank should be regular inspection, repair and maintenance, and a corresponding data files, and scrapped in accordance with the relevant provisions.

10, bulk cement Office of the flow of bulk cement tank and check the dynamic management of the use of, the right to security risks exist to order the rectification, and acts in violation of work safety, according to the administrative penalties.  

© 2015   Guangzhou machinery and equipment co of Nova Scotia     all rights reserved

address: Zhuhai Nanping science and technology industrial park screen North 16th,    Tel: 400-1234-567   fax: 0756-1234567